I've put this post in the National Rally Thread as it relates to our preparation for the rally, so Moderators if its in the wrong spot please move or delete as the case maybe.
An update from the Sabie Camp
Mrs Sabie's Boulevard is in getting the modifications to the controls. What they've done is very clever in relocating the floor boards with an adapter plate which will be powder coated, i was actually very impressed with the work. the adapter bracket has brought the floor boards out about an inch and back about 2 inches.
A set of Risers to bring the handle bars up an inch and back 2 inches. We've been in to do the final measure up and so the final trim, paint and powder coat and final assembly is underway.
Mrs Sabie, Jim and Laurel and myself have had our first route planning meeting and out departure date is Saturday the 10th March 2014.