Farkles, Gear & Accessories > Construction and Major Projects
A bit on the side
Cesspool:
So I put the sidecar frame there to see what is involved.
The main mount near the footpeg doesn't look too tricky. The upper rear mounting will replace the lifting handle. Easy.
The front upper mounting goes onto the two sub frame bolts and will poke out of the little fairing cover, but the lower forward mounting.... ?
Looks like some major bracket work to do there.
Sent from my XT1068 using Tapatalk
West Aussie Glen:
I assume there should be 3 photos in your post but I can not see them??
Brock:
There are links to google photos there, but I dont know how to fix them.
Shiney:
--- Quote from: Brock on July 03, 2015, 08:14:22 AM ---There are links to google photos there, but I dont know how to fix them.
--- End quote ---
Brock, a way to fix them is:
Go to each link from the post,
Left click on each image (making them big),
Right click on the big image and select view image,
Copy the address from the address bar and use it as the link to the image :grin
Brock:
Well there you go
Navigation
[0] Message Index
[#] Next page
Go to full version